Source : http://civilengineerblog.com/glass-work-high-rise-building-construction/
Glass type and the cladding supporting
details must meet the requirements of the design, the steel details must
be painted anti-rust. The moving details (like hinge, pin and varieties
of locks …) are not be leaned against the glass and the glass frame
structure.
Mastic installing glass will be plastic
enough to insert glass and calk tightly plots between glass and frame.
After placing into the position of frame, the surface of glass shouldn’t
be cracked. As inserting the mastic, it shouldn’t press strongly. The
plastic and soft of the mastic will easily press and flat to create the
continuous lines without rough, without sticky in neither the glass nor
frame and without sliding to the surface of structure.
When checking plastic of the mastic with
the pressing layer thick 0.5mm arranging to the steel panel, will not
less than 20mm. Mastic near glass when put into use must be packed
tightly with the brand of manufacturing place and must be ensured for
the product quality as regulated.
The glass product delivered to the Site
must be ready tolled in accordance with the order dimension or design.
Enclosed with the glass product must have the cladding supports and
positioning nails. The glass cutting must be done by the professional
workers. The glass products after cut must be packed into the container
in accordance with each size and arrange into set for each room, flat or
construction.
The glass will be installed deep into
the groove of the frame as ¾ the width of the groove. Between glass face
and the slope of groove will have an opening area at least 2mm for
insert mastic. The layer of mastic above will be continuous, smooth.
Plain glass, decorating patterned glass,
opaque glass, structured glass besides the designed regulations, must
be positioned firmly by suitable details with the material &
structure of the glass frame as follows:
• Wooden frame – the
glass is positioned by the pin, the space between the pins is not over
300mm. On each glass side, no. of positioning pins is minimum two.
• If use the steel splint, between the glass and splint must have the rubber supporting and use the positioning screw with the inclining angle of 450 compare to the glass plane.
• Steel frame – Aluminium alloy frame – the glass is positioned by the rubber splint with the galvanized steel splint. Connection between splint and frame depending on the screws put into the ready tolled holes. For some kinds of steel or Aluminium alloy frames, to position the glass, use the forming splint with the enclosed rubber supports
• Plastic frame – the glass is positioned by the plastic splint screwed & and placed mastic inside.
• Reinforced concrete frame – the glass is positioned by the steel edging details
plunged into the concrete & the steel splints with the plastic or rubber support.
• If use the steel splint, between the glass and splint must have the rubber supporting and use the positioning screw with the inclining angle of 450 compare to the glass plane.
• Steel frame – Aluminium alloy frame – the glass is positioned by the rubber splint with the galvanized steel splint. Connection between splint and frame depending on the screws put into the ready tolled holes. For some kinds of steel or Aluminium alloy frames, to position the glass, use the forming splint with the enclosed rubber supports
• Plastic frame – the glass is positioned by the plastic splint screwed & and placed mastic inside.
• Reinforced concrete frame – the glass is positioned by the steel edging details
plunged into the concrete & the steel splints with the plastic or rubber support.
In the house & the other civil
constructions, do not allow to assembly the connected glass (in one
glass compartment), the glass got the cracks over 10mm long, the unable
cleaning stain or the glass got foreign bodies or other defectives …In
case that the glass compartment has got the connection, need to
negotiate with the construction designer. Then, one glass compartment
can be assembled by two pieces & place overlapped one piece of 20mm.
Two sides of the glass piece must be positioned tightly by splint with
no. of screws or nails at least 2, then filled two sides by mastic.
The glass assembling into frame belongs
to the covering structure takes the light from outside, besides the
tight position and tight connection between glass & frame, need to
ensure for not let water go through or absorb through the connected
positions between the glass & frame. The steel connecting details
must be anti-rusted by painted or galvanized. The used mastic must stand
the affection of regular rain & sun.
The multi-layer glass must be installed
into the wooden frame, steel frame or reinforced steel frame as well as
fixed tightly by rubber spacer, plastic spacer with steel splint or by
screw and placing mastic.
0 komentar: